Contractors and construction

Health and safety software for contractors and construction firms

The pack a principal contractor asks for, produced from the van in minutes: construction phase plan, RAMS, permits, inductions and the sign-on record behind them.

Start free trial

What the law asks of you

The duties behind the paperwork

CDM 2015

The Construction (Design and Management) Regulations 2015 put named duties on the client, principal designer, principal contractor and contractor. On a notifiable job you need a construction phase plan before work starts, and the pre-construction information has to reach the people doing the work.

Risk assessments and method statements

The Management of Health and Safety at Work Regulations 1999 require a suitable and sufficient assessment of the risks. On site that usually arrives as a RAMS pack, signed by the crew who will follow it.

Work at height and inspection records

The Work at Height Regulations 2005 ask for planning, supervision and a rescue plan, and scaffolds and mobile towers carry their own inspection record.

Permits to work

Hot works, confined spaces, live services and excavations are usually controlled by permit, with precautions ticked before issue and the permit closed afterwards.

RIDDOR

Specified injuries, over-seven-day absences and dangerous occurrences are reportable to the HSE, and the accident record has to be kept whether or not it is reportable.

How Oberon answers them

The parts you will use most

CDM and RAMS pack

Construction phase plan, method statements and a RAMS pack a principal contractor will accept, written once and reused.

Permits to work

Permit builder with precautions that must be ticked before issue, plus your own custom precautions and PPE.

Site sign-on and inductions

QR sign-in for crew, subcontractors and visitors, with the induction taken before entry.

Crew app

Read the RAMS, sign it, run pre-use checks and report a problem, tolerant of a site with no signal.

Incidents and RIDDOR

Report from the phone with photos and a body map; the office gets the RIDDOR decision helper and the investigation trail.

Prices are published in full on the pricing page. A workforce that swells for part of the year is covered by seasonal seats.

And every other workplace

Not your industry? It still fits.

Oberon is not built for seven industries. It is built for any UK workplace with people, premises and paperwork to keep straight.

See every industry we serve

Put your next job's paperwork together tonight and see how it reads.

7-day free trial. Card required to start, cancel any time before it ends.

Start free trial